Large Dome Assemble : Finish Up The Remainder Work

Next morning, we continue cut the polypipe joints because we not able to finish it yesterday. A curve have been mark on the polypipe for the workshop's worker to cut it with machine (to make work easier)


mark a curve before cut with machine



the worker that help us to cut



cutting process




after that, warm up the polypipe with the fire



then immediately clip it with two pieces of flat wood



to make the surface flat



polish to make the side smooth



done~



marking on the middle for the screw's hole



the screw's hole will on the middle of the 'X' mark




machine that used to screw the hole




hit it with wood hammer to make it fit into the bamboo



some was quite lose, problem solve with inserting some
bamboo remainder to tighten it



Finally done our parts!!! HOORAYYY~


Tuesday, September 28, 2010

Large Dome Assemble : Making Connector Day 2

The next day, we still continue making the polypipe joints due to the stock of the polypipe have run out yesterday. Around 10am the new stock of pipe have arrive, then all of us cut according to our need, some need only two and some need four of it.



new arrive : big circle tube





different people cut different parts






its really quite hard to saw it off



We need to cut the polypipe joints into this shape to use as connector between other bamboo struts :


curve at the side


So cutting works begin. Basically we need to cut our self first, only the curve side will be cut by machine.

c
tighten it







due to running out of saw, everyone was just use what they grab xD



Today was a busy day too, our schedule was full of classes. We won't able to finish so much due to limited time. Our works stop in the middle because its already 5pm :( the workshop close at that time. No choice, we have to be early on the next morning to continue our works.



Monday, September 27, 2010

Large Dome Assemble : Making Connector Day


During last weekends, i cant connect to any usm wireless. And it seems no line courage at the moment, so i cant check whether there's update on RUS101 website. What was so unlucky, i receive my friend's text on 7.38am today and i get to know that we need to move all the bamboo struts to studio which have cut by us last friday! Omgod, what RUSH MORNING!


BOO! heart attack
(credit to hbp website)


No choice, we have to move on sharp on 8am to USM Rumpun Buluh site again to take our bamboo struts. Then we move all the way to RST bus stop. We have no energy to move futher, not even to HBP. NEVER. So we roll down the struts through the little hillside to make carrying works easy.



preparing for the roll down



receive it from down



then lift it up into bus









finally reach! lift it down again....



move it to hbp using mankind strength! SUPER HEAVY!





the X-men connector brief us about the size and measurement



our connector should be looks like this when done



decided get the measurement again, so we wont cut it wrong


Unfortunately, our bamboo size was unsuitable for the connector. Some hole was too large and not fitted the polypipe . What can do, we just go back to USM Rumpun Buluh site to search for the suitable struts again. Too bad, we are running out of the suitable size of struts, we just got a few of it, some was not really can fit into the polypipe.



ability to sit anywhere : On Middle Road



ability to sit anywhere 2 : On The Bamboo









finally it divide into two -.-





problem: there was not enough screw in the saw,
just simply stuck some wood stick into the screw holes



supa dupa messy condition in Rumpun Buluh site



move it back to hbp again! arghhhhh!~



trying to make the bamboo thinner ; it's for the connector space



the remainder from the bamboo



take a break! :D

Finally, i able to finish my two bamboo struts. It's really a tiring work. Although it looks like a simple task, but it's never been easier after you try.